Your invitation to attend the
Maintenance & Reliability
Optimization Workshop
3-Dimensional PMOptimizationSM / Planning & Scheduling OptimizationSM / OMESM: Beyond Wrench Time
2-Days That Will Unlock Your Hidden Maintenance Capacity
Nashville, TN
November 10th-11th

This Workshop will Teach you the skills to:
Reduce PM Labor Hours by 40%
Double Maintenance Productivity
Reduce Scheduled Downtime by 60%
Improve PM effectiveness by 50%
Apply LEAN tools to the Maintenance Process
Evolve from "Event-based" to Process Maintenance
Learn the process of 3 Dimensional PMOptimization
Apply the 14 opportunities found within each PM
Fill the CMMS gaps
Develop a strategy for a clear path forwards

Call 1-800-554-0224 or click here for more information.

$995 Includes:
Workshop, Materials,
Breakfast, Lunches
and Breaks

Ask about group rates
Uncovering your Hidden Maintenance Capacity
With backlogs exceeding available labor hours and sites looking for greater reliability, many maintenance teams are seeking out additional resources. In most cases, this capacity can be found within our existing process by identifying loss that is consuming our valuable labor hours.
See for Yourself...
At your convenience take a no risk opportunity to get a feel for LAI's philosophy, unique processes and passion for the Maintenance & Reliability profession.

Judge for yourself if the path outlined in this introductory video is the approach that could take your efforts to new levels. Simply click the picture to the right to view the video and learn more.
Introductory Video
Roll Up Your Sleeves For this Aggressive Agenda
3-Dimensional PMOptimization, Powered By Reliability Fusion 3-Dimensional PMOptimizationSM
The demand for greater asset reliability and cost reduction have most of us turning to our PM Programs. The challenge is what to do once you get there.

3 Dimensional PMOptimizationSM is a process which first opens capacity and elevates effectiveness through 1. Initial Optimization, and continues to dial in the process through an ongoing analysis of 2. PM Task Pass/Fail Analysis and 3. Equipment Reliability Analysis requiring a fraction of the time and resources of other methods including RCM.

The process of 3-Dimensional PMOptimizationSM takes the PM program to previously unreachable new levels by fusing common sense, reliability disciplines, and automation powered by Reliability Fusion, the world’s first 3-D PMOptimization system.
Planning & Scheduling Optimization Planning & Scheduling OptimizationSM
The Work Management Planning & Scheduling SimulationSM is an innovative, interactive means to transfer the many concepts of effective maintenance work management to a group of participants. This simulation goes far beyond showing the importance of proactive maintenance in the pursuit of reliability; it goes on to show the participants how it is attained.

The simulation begins where many organization currently reside, high degrees of reactivity, little or no planning, and scheduling to the degree where Technicians are kept busy with a clipboard of work to do. The simulation encounters unclear job scope, absence of documentation, poorly managed spare parts system, every job being equal in priority, and little history. As each round unfolds, changes are made to change the way we manage work…
OMESM : Beyond "Wrench Time"
By measuring the Availability, Performance and Quality of the maintenance process, we can look way beyond the elusive "wrench-time" to an Overall Maintenance EffectivenessSM (OMESM).

This approach will identify and minimize specific loss to elevate the capacity of your workforce. Once measured, we can apply PMOptimization and drive Planning & Scheduling in a Constraint-Based approach to optimize our process. Many have doubled productivity using this approach which allowed the new-found capacity to fuel additive reliability programs.
The Concepts, tools, and methods conveyed in this workshop are invaluable!"  Call Today to put these tools in your hands...  800.554.0224


This is a commercial message from
LAI Reliability Systems, 145 Southeast Parkway, Suite 120, Franklin, TN 37064
© 2008 LAI Reliability Systems.. All rights reserved.